We strongly objected to several key aspects of a major re-ordering scheme for this medieval church, notably raising and covering the beautiful historic floor to install underfloor heating and create level access. We supported the Victorian Society in their objection to the proposed removal of all the high-quality pews and provided advice on the proposals for a servery and WC and works to the vestry and tower. We recently received a simplified scheme, which retains the existing historic floor and all but two of the historic pews. New ramps will ensure the nave is accessible and the existing heating system will be upgraded. We were delighted that the parish will be able to introduce the necessary facilities and preserve the historic character of the church.